Select Page

Korry 427 switch Korry 428 switch

 

The 427/428 line is our incandescent 5/8-inch product still used extensively in commercial and military aviation. This switch product has been qualified to MIL-PRF-22885. See QPL M22885/109.

  • Two-pole switch (427) and four-pole switch (428)
  • Sunlight readability
  • Momentary/alternate/indicator options
  • Internal moisture seal
  • Optional night-vision lighting
  • Solder-free installation with optional poke-home connector

 

REQUEST A QUOTE